Detaylı Arama

İptal
Bulunan: 4 Adet 0.002 sn
- Eklemek veya çıkarmak istediğiniz kriterleriniz için 'Dahil' / 'Hariç' seçeneğini kullanabilirsiniz. Sorgu satırları birbirine 'VE' bağlacı ile bağlıdır.
- İptal tuşuna basarak normal aramaya dönebilirsiniz.
Filtreler
Erişime Açık

N-person grey game

Erkan KÖSE

Purpose – One important assumption in the conventional cooperative game theory is that payoffs are assumed to be deterministic. In terms of the players’ cognitive ability of the realistic world, this is a very strict assumption. The classical game theory can find no way out when a particular game circumstance involves uncertainty, such as limited knowledge, small sample, and inadequate information, the payoff values of the game can only be described with interval grey numbers. The paper aims to discuss these issues. Design/methodology/approach – In this study the concept of N-person grey games ...Daha fazlası

Erişime Açık

Single machine earliness/tardiness scheduling problem with grey processing times and the grey common due date

Oğuzhan Ahmet ARIK

Purpose – This paper presents a mixed-integer programming model for a single machine earliness/tardiness scheduling problem where the objective is to minimize total earliness/tardiness duration when the uncertainty of parameters such as processing times and due date is coded with grey numbers. Design/methodology/approach – Grey theory and grey numbers are used for illustrating the uncertainty of parameters in processing times and common due date, where the objective is to minimize the total earliness/ tardiness duration. The paper proposes a 0–1 mathematical model for the problem and an effect ...Daha fazlası

Erişime Açık

Simple Assembly Line Balancing Problem of Type 1 with Grey Demand and Grey Task Durations

Oğuzhan Ahmet ARIK | Erkan KÖSE

Purpose – The purpose of this paper is to present a mixed integer programming model for simple assembly line balancing problems (SALBP) with Type 1 when the annual demand and task durations are uncertain and encoded with grey numbers. Design/methodology/approach – Grey theory and grey numbers are used for illustrating the uncertainty of parameters in an SALBP, where the objective is to minimize the total number of workstations. The paper proposes a 0-1 mathematical model for SALBP of Type 1 with grey demand and grey task durations. Findings – The uncertainty of the demand and task durations ar ...Daha fazlası

Erişime Açık

Geodetic deformation forecasting based on multi-variable grey prediction model and regression model

Erkan KÖSE

Purpose – The purpose of this paper is to examine the effectiveness of the multivariable grey prediction model in deformation forecasting. Design/methodology/approach – Deformation in a dam can be seen because of many factors but without any doubt, the most influential factor is the water level. In this study, the deformation level of a point in the Keban Dam crest has been tried to be forecasted depending on the water level by the multivariable grey model GM(1,N). Regression analysis was used to test the accuracy of the prediction results obtained using the grey prediction model. Findings – T ...Daha fazlası

6698 sayılı Kişisel Verilerin Korunması Kanunu kapsamında yükümlülüklerimiz ve çerez politikamız hakkında bilgi sahibi olmak için alttaki bağlantıyı kullanabilirsiniz.
Tamam

creativecommons
Bu site altında yer alan tüm kaynaklar Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.
Platforms