Detaylı Arama

İptal
Bulunan: 1 Adet 0.002 sn
- Eklemek veya çıkarmak istediğiniz kriterleriniz için 'Dahil' / 'Hariç' seçeneğini kullanabilirsiniz. Sorgu satırları birbirine 'VE' bağlacı ile bağlıdır.
- İptal tuşuna basarak normal aramaya dönebilirsiniz.
Filtreler
Erişime Açık

A study on three different hydropower operation rules by monthly and daily time steps

Tefaruk HAKTANIR | Alper AYDEMİR

Operation simulation models are developed for monthly and daily time steps for computing the hydroelectric energy and its financial benefits in an economic life by three different operation policies: steady-rate, three-shift and pumped-storage rules. The pump is operated during the night and consumes low-cost energy. The resulting computer programs, three on monthly and three on daily steps, are applied to the Yamula dam – which is a fairly large dam generating energy, located in the Inland Anatolia region of Turkey – over a period of 35 years using the gauged daily stream flows and daily pan ...Daha fazlası

6698 sayılı Kişisel Verilerin Korunması Kanunu kapsamında yükümlülüklerimiz ve çerez politikamız hakkında bilgi sahibi olmak için alttaki bağlantıyı kullanabilirsiniz.
Tamam

creativecommons
Bu site altında yer alan tüm kaynaklar Creative Commons Alıntı-GayriTicari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.
Platforms